Key Center

Back

Key Center

Miami’s Key Center (USA) is an infrastructure with a 3.2 MW IT Power load, scalable up to 6.7 MW.

Key Center (Miami)

Start of operations2001

IT Rooms 7

Surface 4.192 sqm

Generators’ topology N+1

Cooling systems Chiller N+1 / AHUs N+1

Fiber entries 3

The Data Center, designed, built and operated according to Tier III international standards, is prepared to resist Miami’s seasonal hurricanes, guaranteeing 24x7x365 service.

The center has a 4,192 sqm IT surface, divided in 7 rooms, and is 100% Carrier Neutral.

The center is 100% powered by renewable energies, and has the most efficient cooling systems, to assure environmental care, while keeping a maximum quality uninterrupted service for its clients.

3.2 MW Actual IT Power

6.7 MW Maximum IT