
Key Center
Miami’s Key Center (USA) is an infrastructure with a 3.2 MW IT Power load, scalable up to 6.7 MW.

Key Center (Miami)
Start of operations2001
IT Rooms 7
Surface 4.192 sqm
Generators’ topology N+1
Cooling systems Chiller N+1 / AHUs N+1
Fiber entries 3
The Data Center, designed, built and operated according to Tier III international standards, is prepared to resist Miami’s seasonal hurricanes, guaranteeing 24x7x365 service.
The center has a 4,192 sqm IT surface, divided in 7 rooms, and is 100% Carrier Neutral.
The center is 100% powered by renewable energies, and has the most efficient cooling systems, to assure environmental care, while keeping a maximum quality uninterrupted service for its clients.
3.2 MW
Actual IT Power
6.7 MW
Maximum IT